"They deliver on time or soon if they are able. What stands out about their system is that it is, strong and sturdy, well braced - able to work or move about on it with confidence. The best use of their product are projects with high mid floors, flat roofs or truss projects with large open spans.
The safety deck system gives us the ability to work and move across the roof area easily. For example, it took one week for two men to pitch a roof. If we had to do it off mobile scaffolds then it would have taken one and a half weeks three men minimum to get the same result. We went with Safety Decks because of the persistent efforts of Bill encouraging us to try this."